Skip to product information
1 of 15

Carro Lotus Smart Ceiling Fan Control and Light Dimmer Switch Combo, WiFi Wall Switch(1-Gang)

PN-04F02D-WH01

Regular price
$49.00
Regular price
$59.00
Sale price
$49.00
Shipping calculated at checkout.
Fan model matters
Only Suitable for Carro AC motor ceiling fans
  • DIMMABLE FUNCTION: Control your fan speed (low, medium and high) and light brightness (dimmable light kit required)for indoor and outdoor ceiling fans or schedule a timed event. Gentle dimmable lighting control will increase your comfort and add soothing visual effect.
  • SMART FEATURES: Control from anywhere through WiFi. Syncs with IOS & Android App; Alexa, Google Home, Siri Shortcut, and Smart App for a convenient voice control of the light and fan.
  • SHORTCUT BUTTONS: Switch directly to Sleep Breeze or Night Light mode.
  • UNIVERSAL FIT: Easily turn your existing AC ceiling fan into a smart device with our universal switch and the beis st of all, no Hub required. Can replace any existing wall switches for your AC ceiling fans.
  • FAST INSTALLATION: Quick and easy setup. Based in the USA, Carro Home offers high quality products at affordable prices backed by professional customer support.
  • Hurry up! Sale end in:

    15% off

    Code:

    SWITCH15

      Fan model matters
      Only Suitable for Carro AC motor ceiling fans
    • DIMMABLE FUNCTION: Control your fan speed (low, medium and high) and light brightness (dimmable light kit required)for indoor and outdoor ceiling fans or schedule a timed event. Gentle dimmable lighting control will increase your comfort and add soothing visual effect.
    • SMART FEATURES: Control from anywhere through WiFi. Syncs with IOS & Android App; Alexa, Google Home, Siri Shortcut, and Smart App for a convenient voice control of the light and fan.
    • SHORTCUT BUTTONS: Switch directly to Sleep Breeze or Night Light mode.
    • UNIVERSAL FIT: Easily turn your existing AC ceiling fan into a smart device with our universal switch and the beis st of all, no Hub required. Can replace any existing wall switches for your AC ceiling fans.
    • FAST INSTALLATION: Quick and easy setup. Based in the USA, Carro Home offers high quality products at affordable prices backed by professional customer support.
    • Shipping

      Free Shipping $39+

      Order Processing Time: Within 1-2 business days.

      Estimate Transit Time: Shipping takes 2-6 business days. (continental USA only)

      More details please see our shipping & receiving.

      RETURNS INFO
      UNIVERSAL FIT:Easily turn your existing AC ceiling fan into a smart device with our universal smart switch and the best of all, no Hub required.Can replace any existing wall switches for your AC ceiling fans.
      Carro Home Ceiling Fan Smart Switch. Turn your existing AC ceiling fan into a smart device with our universal smart switch. Carro Home smart switch can replace any existing wall switches for your AC ceiling fans. Gentle Light Dimmer functions will provide comfortable ambience.  Carro Locus Smart Switch features in-wall compact design with white plate and modern clean lines, perfect for any décor. ETL and FCC Certified. Designed in California.
      Carro Home Ceiling Fan Smart Switch. Turn your existing AC ceiling fan into a smart device with our universal smart switch. Carro Home smart switch can replace any existing wall switches for your AC ceiling fans. Gentle Light Dimmer functions will provide comfortable ambience.  Carro Locus Smart Switch features in-wall compact design with white plate and modern clean lines, perfect for any décor. ETL and FCC Certified. Designed in California.
      Carro Home Ceiling Fan Smart Switch. Turn your existing AC ceiling fan into a smart device with our universal smart switch. Carro Home smart switch can replace any existing wall switches for your AC ceiling fans. Gentle Light Dimmer functions will provide comfortable ambience.  Carro Locus Smart Switch features in-wall compact design with white plate and modern clean lines, perfect for any décor. ETL and FCC Certified. Designed in California.
      Carro Home Ceiling Fan Smart Switch. Turn your existing AC ceiling fan into a smart device with our universal smart switch. Carro Home smart switch can replace any existing wall switches for your AC ceiling fans. Gentle Light Dimmer functions will provide comfortable ambience.  Carro Locus Smart Switch features in-wall compact design with white plate and modern clean lines, perfect for any décor. ETL and FCC Certified. Designed in California.
      Carro Home Ceiling Fan Smart Switch. Turn your existing AC ceiling fan into a smart device with our universal smart switch. Carro Home smart switch can replace any existing wall switches for your AC ceiling fans. Gentle Light Dimmer functions will provide comfortable ambience.  Carro Locus Smart Switch features in-wall compact design with white plate and modern clean lines, perfect for any décor. ETL and FCC Certified. Designed in California.
      Carro Home Ceiling Fan Smart Switch. Turn your existing AC ceiling fan into a smart device with our universal smart switch. Carro Home smart switch can replace any existing wall switches for your AC ceiling fans. Gentle Light Dimmer functions will provide comfortable ambience.  Carro Locus Smart Switch features in-wall compact design with white plate and modern clean lines, perfect for any décor. ETL and FCC Certified. Designed in California.
      Carro Lotus Smart Ceiling Fan Control and Light Dimmer Switch Combo, WiFi Wall Switch(1-Gang)
      Carro Home Ceiling Fan Smart Switch. Turn your existing AC ceiling fan into a smart device with our universal smart switch. Carro Home smart switch can replace any existing wall switches for your AC ceiling fans. Gentle Light Dimmer functions will provide comfortable ambience.  Carro Locus Smart Switch features in-wall compact design with white plate and modern clean lines, perfect for any décor. ETL and FCC Certified. Designed in California.
      Carro Home Ceiling Fan Smart Switch. Turn your existing AC ceiling fan into a smart device with our universal smart switch. Carro Home smart switch can replace any existing wall switches for your AC ceiling fans. Gentle Light Dimmer functions will provide comfortable ambience.  Carro Locus Smart Switch features in-wall compact design with white plate and modern clean lines, perfect for any décor. ETL and FCC Certified. Designed in California.
      Carro Home Ceiling Fan Smart Switch. Turn your existing AC ceiling fan into a smart device with our universal smart switch. Carro Home smart switch can replace any existing wall switches for your AC ceiling fans. Gentle Light Dimmer functions will provide comfortable ambience.  Carro Locus Smart Switch features in-wall compact design with white plate and modern clean lines, perfect for any décor. ETL and FCC Certified. Designed in California.
      UNIVERSAL FIT:Easily turn your existing AC ceiling fan into a smart device with our universal smart switch and the best of all, no Hub required.Can replace any existing wall switches for your AC ceiling fans.
      UNIVERSAL FIT:Easily turn your existing AC ceiling fan into a smart device with our universal smart switch and the best of all, no Hub required.Can replace any existing wall switches for your AC ceiling fans.
      UNIVERSAL FIT:Easily turn your existing AC ceiling fan into a smart device with our universal smart switch and the best of all, no Hub required.Can replace any existing wall switches for your AC ceiling fans.

      Overview

      Smafan smart fan switch is a smart wall switch designed to replace any existing wall switches for your AC motor ceiling fans and turn the ceiling fan into a smart device with your existing wiring. So you don't have to mess around inside of your walls or ceilings. There are no extra cables needed for installation either! Voice-control and led, wifi-enabled, app-controlled, the WiFi smart switch Controls your devices without getting up, any time of day or night! And the light dimmer adjusts brightness for comfort!

      Note: Only Suitable for AC ceiling fans. REQUIRES NEUTRAL WIRE(white), LIVE WIRE (red or black), BARE or, GROUND WIRE(green) and SEPARATE LOAD WIRES for FAN & LIGHT.
      Max ceiling fan load of 1.5A (Offers 3 fathe n speeds control), max light load of 2.5A, max power if 400W/gang. 2.4G Wi-Fi only (NOT 5G); single-pole use only (NOT 3-way).
      Not compatible with fans featuring built-in remote-control system. Do not use with exhaust fans.

      Specifications

      • ETL Certified Product
      • Power Supply: AC 120V
      • Rating Frequency: 60Hz
      • Max ceiling fan load:1.5A
      • Max light load 2.5A
      • Power: 400W/gang
      • Wireless Standard: WiFi 2. 4GHz only (NOT 5G).Press and hold the pair button at the bottom for 5 Seconds to reconnection and App conncetion.
      • Neutral Wire Required
      • Switch Control: Available for 3 Fan Speeds, Speed Up/Down, Fan On/Off, Light On/Off/Dim, Sleep Breeze and Night light modes.
      • Smart Control: IOS & Android App, Amazon Alexa, Google Home, and Siri Shortcut
      • Control fan from anywhere using Carrohome App.

      Reviews